72436 - CHA Compactor Relocation

The project consists of the conversion of a section of terminal parking lot to the location of the trash compactor, cardboard dumpster and delivery truck unloading dock. The scope encompasses concrete pads for all three, curb cut on airport road for new access, curb and gutter, decorative and screening fencing, electrical, landscaping, and other related work as shown on the drawings and/or in the specifications. There is also an alternate to replace the existing asphalt lot with concrete paving.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications are available for purchase at contractors expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
001 COVER 75.8 KB
002 C0.1 346.4 KB
003 C1.0 447.9 KB
004 C1.1 299.2 KB
005 C1.2 305.3 KB
006 C2.1A 248.8 KB
007 C2.1B 304.0 KB
008 C2.2 188.3 KB
009 C3.1 323.8 KB
010 C4.1 245.8 KB
011 C4.2 163.6 KB
012 L1.1 974.5 KB
013 L2.1 813.0 KB
014 E0.1 794.4 KB
015 E1.0 656.1 KB
016 E2.0 725.0 KB