72346 - CHA West Side Apron Construction
The project consists of construction of 11,200 SY of new pavement apron and a 325 LF taxiway connector with site preparation for future hangar development. The scope encompasses all erosion control, storm drainage installation, earthwork embankment, fine grading, asphalt pavement construction, electrical lighting and signage, pavement markings, turfing and other related work as shown on the drawings and/or in the specifications.
Addenda
(click to expand/collapse)

Name | Size | |||
Addendum No. 1 - 72346 | 3.5 MB | |||
Addendum No. 2 - 72346 | 657.0 KB |